Document Downloads: Planning
The following documents are available for download. Documents in PDF format can be read using Adobe Reader.
MS Word and Powerpoint documents can be read by using their respective applications or any alternatives.
Available downloads
ABOLITION OF REGIONAL STRATEGIES
ABOLITION OF REGIONAL STRATEGIES
-
ABOLITION OF REGIONAL STRATEGIES
(PDF)
Size: 47.85 KB
Estimated download time: (56k = 8 secs)
Atherstone Retail Study
Retail Appraisal on Aldi Superstore - Donaldsons 2004
-
Retail Appraisal on Aldi Superstore (Donaldsons 2004)
(PDF)
Size: 12.57 MB
Estimated download time: (56k = 31 mins 23 secs)
-
Atherstone Retail Study
(PDF)
Size: 656.88 KB
Estimated download time: (56k = 1 mins 38 secs)
Coleshill Retail Study (2009)
Limes Developments Limited - Planning Policy and Retail Study 2009
-
Coleshill Retail Study (2009)
(PDF)
Size: 2.32 MB
Estimated download time: (56k = 5 mins 48 secs)
Core Strategy Examination Documents
Examination Documents
-
Letter from Inspector to NWBC (22nd March 2013)
(PDF)
Size: 135.24 KB
Estimated download time: (56k = 20 secs)
-
Letter from NWBC to Inspector (28th March 2013)
(PDF)
Size: 204.69 KB
Estimated download time: (56k = 30 secs)
-
Letter from Inspector to NWBC (22nd April 2013)
(DOC)
Size: 37.5 KB
Estimated download time: (56k = 6 secs)
-
Core Strategy Submission Letter
(DOC)
Size: 209 KB
Estimated download time: (56k = 31 secs)
-
Core Strategy Consultation Statement
(DOC)
Size: 111 KB
Estimated download time: (56k = 17 secs)
-
Duty to Co-operate (as of February 2013)
(DOC)
Size: 432.5 KB
Estimated download time: (56k = 1 mins 5 secs)
-
Core Strategy Submission Version
(PDF)
Size: 792.39 KB
Estimated download time: (56k = 1 mins 56 secs)
-
Letter from Inspector to NWBC (26 April 2013)
(PDF)
Size: 18.91 KB
Estimated download time: (56k = 3 secs)
-
Letter from NWBC to Inspector (9th May)
(PDF)
Size: 28.83 KB
Estimated download time: (56k = 5 secs)
-
Letter from Inspector to NWBC (14th May)
(PDF)
Size: 21.65 KB
Estimated download time: (56k = 4 secs)
-
Agenda - Exploratory Meeting (5th June)
(PDF)
Size: 13.23 KB
Estimated download time: (56k = 2 secs)
-
Preliminary Hearing Agenda (5th June)
(PDF)
Size: 21.1 KB
Estimated download time: (56k = 4 secs)
Development Control - Planning Application Validation Requirements
Planning Application Validation Requirements document setting out both the local and national requirements to ensure a planning application is valid.
-
Planning Application Validation Requirements (December 2010)
(PDF)
Size: 240.36 KB
Estimated download time: (56k = 36 secs)
Development Control - Pre-Application Forms
Pre-application forms to seek advice and guidance on extensions and alterations to existing dwellings, and for other types of proposed development
-
General Pre-Application Form
(PDF)
Size: 32.21 KB
Estimated download time: (56k = 5 secs)
-
Householder Pre-Application Form (for existing dwellings only)
(PDF)
Size: 31.88 KB
Estimated download time: (56k = 5 secs)
Engaging the community and small businesses in the Planning Process
A day of presentations and discussions, with lunch, for community groups, small businesses, Business Link advisors, parish councils and individuals.
-
Engaging the community and small businesses in the Planning Process
(DOC)
Size: 20 KB
Estimated download time: (56k = 3 secs)
Fees and Charges
Fees and Charges for services including leisure activities
-
Fees and Charges updated April 2013
(PDF)
Size: 854.75 KB
Estimated download time: (56k = 2 mins 6 secs)
Framework for Sustainable Rural Action
Framework for Sustainable Rural Action May 2006
-
Framework for Sustainable Rural Action
(DOC)
Size: 179 KB
Estimated download time: (56k = 27 secs)
Hedges - Information on Garden Hedges
Advice from the Royal Horticultural Society on Garden Hedges
-
Hedges - garden hedges information
(PDF)
Size: 362.29 KB
Estimated download time: (56k = 53 secs)
High Hedges - Preventing and Dealing with Complaints
Information from Government about preventing complaints arising from high hedges and the procedure for dealing with complaints
-
High Hedges Complaints - Prevention and Cure
(PDF)
Size: 768.31 KB
Estimated download time: (56k = 1 mins 53 secs)
Listed Building and Scheduled Ancient Monuments List
Download a list of the Borough's Listed Buildings and Scheduled Ancient Monuments
-
Listed Building List
(PDF)
Size: 73.25 KB
Estimated download time: (56k = 11 secs)
-
Ancient Monuments List
(PDF)
Size: 47.53 KB
Estimated download time: (56k = 7 secs)
Local Plan 2006 Inquiry Core Documents
All Core Documents used in the 2006 Local Plan inquiry where not provided by other sources (such as PPGs and PPSs)
-
CD035 - Urban Capacity Study
(PDF)
Size: 129.81 KB
Estimated download time: (56k = 19 secs)
-
CD037 - Sustainability Appraisal for North Warwickshire (December 2002)
(PDF)
Size: 17.98 KB
Estimated download time: (56k = 3 secs)
-
CD038a - Housing Needs Survey (2004) - Full Report
(PDF)
Size: 1.26 MB
Estimated download time: (56k = 3 mins 9 secs)
-
CD038b - Housing Needs Survey (2004) - Executive Summary
(PDF)
Size: 236.25 KB
Estimated download time: (56k = 35 secs)
-
CD039a - Draft Affordable Housing Protocol (April 2004)
(PDF)
Size: 160.61 KB
Estimated download time: (56k = 24 secs)
-
CD039b - List of Preferred RSL Partners
(PDF)
Size: 51.38 KB
Estimated download time: (56k = 8 secs)
-
CD040 - Draft Housing Background Paper (March 2004)
(PDF)
Size: 129.51 KB
Estimated download time: (56k = 19 secs)
-
CD041 - Draft Employment Background Paper (March 2004)
(PDF)
Size: 126.35 KB
Estimated download time: (56k = 19 secs)
-
CD046 - RTS1: Locational Strategy Topic Paper (November 2004)
(PDF)
Size: 72.36 KB
Estimated download time: (56k = 11 secs)
-
CD047 - RTS2: Employment Land Topic Paper (November 2004)
(PDF)
Size: 54.39 KB
Estimated download time: (56k = 8 secs)
-
CD048 - RTS3: Housing Numbers Topic Paper (November 2004)
(PDF)
Size: 121.01 KB
Estimated download time: (56k = 18 secs)
-
CD049 - RTS4: Affordable Housing Topic Paper (November 2004)
(PDF)
Size: 359.86 KB
Estimated download time: (56k = 53 secs)
-
CD050 - Industrial and Commercial Building Supply (Chesterton Report) (2001)
(PDF)
Size: 212.15 KB
Estimated download time: (56k = 32 secs)
-
CD054a - Executive Board Report: 21/10/2002
(PDF)
Size: 1.04 MB
Estimated download time: (56k = 2 mins 36 secs)
-
CD054b - Executive Board Report: 07/07/2003
(PDF)
Size: 913.37 KB
Estimated download time: (56k = 2 mins 14 secs)
-
CD054c - Executive Board Report: 11/03/2004
(PDF)
Size: 664.16 KB
Estimated download time: (56k = 1 mins 38 secs)
-
CD059 - Framework for Urban Capacity (2002)
(PDF)
Size: 952.32 KB
Estimated download time: (56k = 2 mins 20 secs)
-
CD060 - Draft HNS Guidance (Cambridge Centre for Housing and Planning)
(PDF)
Size: 495.69 KB
Estimated download time: (56k = 1 mins 14 secs)
-
CD061 - Assessing Housing Needs in the South East: A Good Practice Guide (2004)
(PDF)
Size: 735.1 KB
Estimated download time: (56k = 1 mins 48 secs)
-
CD063 - Letter from ODPM re preparation of LDSs
(PDF)
Size: 447.35 KB
Estimated download time: (56k = 1 mins 6 secs)
-
CD064 - Demand for Business Premises to 2000 m2 in North Warwickshire
(PDF)
Size: 182.3 KB
Estimated download time: (56k = 27 secs)
-
CD066 - Letter from Cllr Powell re: Affordable Housing Scheme (January 2005)
(PDF)
Size: 632.01 KB
Estimated download time: (56k = 1 mins 33 secs)
-
CD068 - Letter re: Transport Provision in North Warks from Warwickshire County Council (January 2005)
(PDF)
Size: 555.8 KB
Estimated download time: (56k = 1 mins 23 secs)
-
CD072 - Independent Expert Group on Mobile Phones: Mobile Phones and Health (The Stewart Report) (2000)
(PDF)
Size: 1.12 MB
Estimated download time: (56k = 2 mins 48 secs)
-
CD077 - Statement from Leader of North Warwickshire Borough Council (2005)
(PDF)
Size: 15.25 KB
Estimated download time: (56k = 3 secs)
-
CD078 - Putting Our House in Order: Towards a Regional Housing Strategy for the West Midlands (2003)
(PDF)
Size: 1.84 MB
Estimated download time: (56k = 4 mins 38 secs)
-
CD079 - Planning to Deliver - The Managed Release of Housing Sites: Towards Better Practice (2001)
(PDF)
Size: 227.68 KB
Estimated download time: (56k = 34 secs)
-
CD080 - A New Deal for Transport - Better for Everyone (1998)
(PDF)
Size: 1.15 MB
Estimated download time: (56k = 2 mins 53 secs)
-
CD081 - North Warwickshire Economic Strategy 2003-2008 and Economic Action Plan 2003-2004 (2003)
(PDF)
Size: 184.63 KB
Estimated download time: (56k = 28 secs)
-
CD082 - Energy White Paper: Our Energy Future - Creating a Low Carbon Economy (2003)
(PDF)
Size: 835.04 KB
Estimated download time: (56k = 2 mins 3 secs)
-
CD083 - Rural White Paper - Our Countryside: The Future - A Fair Deal for Rural England (2000)
(PDF)
Size: 2.73 MB
Estimated download time: (56k = 6 mins 50 secs)
-
CD084 - Secretary of State's Decision Letter for Purley Chase (2004)
(PDF)
Size: 1.28 MB
Estimated download time: (56k = 3 mins 12 secs)
-
CD085 - Notes of RTS1: Location Strategy (January 2005)
(PDF)
Size: 31.91 KB
Estimated download time: (56k = 5 secs)
-
CD086 - Notes of RTS2: Employment Land (January 2005)
(PDF)
Size: 29.89 KB
Estimated download time: (56k = 5 secs)
-
CD087 - Notes of RTS3: Housing Numbers (January 2005)
(PDF)
Size: 43.34 KB
Estimated download time: (56k = 7 secs)
-
CD088 - Notes of RTS4: Affordable Housing (January 2005)
(PDF)
Size: 34.04 KB
Estimated download time: (56k = 5 secs)
-
CD090 - Inspector's Note on Housing Policy Formation (2005)
(PDF)
Size: 19.33 KB
Estimated download time: (56k = 3 secs)
-
CD091 - West Midlands to East Midlands Multi Modal Study (August 2003)
(PDF)
Size: 3.72 MB
Estimated download time: (56k = 9 mins 18 secs)
-
CD093 - Warwickshire County Council School Framework 2005-2010
(PDF)
Size: 707.9 KB
Estimated download time: (56k = 1 mins 44 secs)
-
CD095 - Inspectors Decision Letter for land to the rear of the Beehive Public House, Curdworth (2004)
(PDF)
Size: 1.16 MB
Estimated download time: (56k = 2 mins 54 secs)
-
CD097 - Deliverability of Allocated Housing Sites (January 2005)
(PDF)
Size: 27.37 KB
Estimated download time: (56k = 5 secs)
-
CD098 - Housing Needs Study Sub-Areas (2003)
(PDF)
Size: 1012.52 KB
Estimated download time: (56k = 2 mins 29 secs)
-
CD099 - Control of Windfall Housing (2005)
(PDF)
Size: 25.83 KB
Estimated download time: (56k = 4 secs)
-
CD100 - Employment Thresholds (2005)
(PDF)
Size: 46.06 KB
Estimated download time: (56k = 7 secs)
-
CD102a - Executive Board Report regarding Housing Needs Survey (2004)
(PDF)
Size: 13 KB
Estimated download time: (56k = 2 secs)
-
CD102a - Executive Board Minutes regarding Housing Needs Survey (2004)
(PDF)
Size: 20.99 KB
Estimated download time: (56k = 4 secs)
-
CD104 - Birch Coppice 106 Agreements, Planning Applications and Permissions (2005)
(PDF)
Size: 13.92 KB
Estimated download time: (56k = 3 secs)
-
CD107 - Information on In Commuting, Unemployment, the West Midlands Economic Strategy and Employment Land Availability (2005)
(PDF)
Size: 20.36 KB
Estimated download time: (56k = 3 secs)
-
CD108 - Mobile Police Van Timetable (2005)
(PDF)
Size: 56.5 KB
Estimated download time: (56k = 9 secs)
-
CD112 - Potential Policy Revisions (March 2005)
(PDF)
Size: 37.86 KB
Estimated download time: (56k = 6 secs)
-
CD117 - Planning Tomorrow's Countryside (2000)
(PDF)
Size: 731.53 KB
Estimated download time: (56k = 1 mins 48 secs)
-
CD119 - The EC Habitats Directive: Council Directive 92/43/EEC on the Conservation of Natural Habitats and of Wild Fauna and Flora
(PDF)
Size: 653.62 KB
Estimated download time: (56k = 1 mins 36 secs)
-
CD120 - The West Midlands Area Multi Modal Study: Final Report (2001)
(PDF)
Size: 3.21 MB
Estimated download time: (56k = 8 mins 2 secs)
-
Core Documents Full List
(PDF)
Size: 17.06 KB
Estimated download time: (56k = 3 secs)
North Warwickshire Community Partnership Local Economy Action Plan
North Warwickshire Community Partnership Local Economy Action Plan
-
North Warwickshire Community Partnership Local Economy Action Plan
(DOC)
Size: 41 KB
Estimated download time: (56k = 6 secs)
Planning Consultation Forms
-
Core Strategy Publication Stage Representation Form
(DOC)
Size: 1.34 MB
Estimated download time: (56k = 3 mins 23 secs)
Planning Scale of Fees
Fees due for planning applications, applicable from 22 November 2012.
-
Planning Application Fees (effective 22 November 2012)
(PDF)
Size: 120.4 KB
Estimated download time: (56k = 18 secs)
Round Table Session Agendas
-
Round Table Session 1 Agenda
(DOC)
Size: 30 KB
Estimated download time: (56k = 5 secs)
-
Round Table Session 2 Agenda
(DOC)
Size: 33.5 KB
Estimated download time: (56k = 5 secs)
-
Round Table Session 3 Agenda
(DOC)
Size: 30.5 KB
Estimated download time: (56k = 5 secs)
-
Round Table Session 3 Agenda Appendix
(DOC)
Size: 36.5 KB
Estimated download time: (56k = 6 secs)
-
Round Table Session 4 Agenda
(DOC)
Size: 30.5 KB
Estimated download time: (56k = 5 secs)
Rural Policy Statement
Rural Policy Statement
-
Rural Policy Statement
(DOC)
Size: 25 KB
Estimated download time: (56k = 4 secs)
Strategic Flood Risk Assessment
Strategic Flood Risk Assessment for North Warwickshire
-
North Warwickshire Level 1 Strategic Flood Risk Assessment
(PDF)
Size: 2.92 MB
Estimated download time: (56k = 7 mins 18 secs)
-
Appendix A (1)
(PDF)
Size: 15.15 KB
Estimated download time: (56k = 3 secs)
-
Appendix A (2)
(PDF)
Size: 37.29 KB
Estimated download time: (56k = 6 secs)
-
Appendix B
(PDF)
Size: 1.76 MB
Estimated download time: (56k = 4 mins 24 secs)
-
Appendix C
(PDF)
Size: 366.08 KB
Estimated download time: (56k = 54 secs)
Tamworth Future Development and Infrastructure Study
Tamworth Future Development and Infrastructure Study main report and appendicies
-
Tamworth Future Development and Infrastructure Study
(PDF)
Size: 831.5 KB
Estimated download time: (56k = 2 mins 2 secs)
-
Appendix 1 - The Study Brief
(PDF)
Size: 53.45 KB
Estimated download time: (56k = 8 secs)
-
Appendix 2 - Study Area Boundary
(PDF)
Size: 5.27 MB
Estimated download time: (56k = 13 mins 11 secs)
-
Appendix 3 - Environmental Constraints Plans
(PDF)
Size: 5.93 MB
Estimated download time: (56k = 14 mins 50 secs)
-
Appendix 4 - Community Infrastructure Accessibility and Highway
(PDF)
Size: 10.37 MB
Estimated download time: (56k = 25 mins 54 secs)
-
Appendix 5 - Tamworth SHLAA - Analysis of Availability Information
(PDF)
Size: 20.74 KB
Estimated download time: (56k = 4 secs)
-
Appendix 6 - Growth Options Location Plan
(PDF)
Size: 593.58 KB
Estimated download time: (56k = 1 mins 27 secs)
-
Appendix 7 - Growth Options Sustainability Matrix
(PDF)
Size: 77.8 KB
Estimated download time: (56k = 12 secs)
-
Appendix 8 - Approach Towards the Identification and Costing of Main Infrastructure Requirements
(PDF)
Size: 65.55 KB
Estimated download time: (56k = 10 secs)
-
Appendix 9 - Growth Options Sustainability Assessment Results
(PDF)
Size: 557.63 KB
Estimated download time: (56k = 1 mins 23 secs)
-
Appendix 10 - Growth Options Infrastructure Costs
(PDF)
Size: 61.97 KB
Estimated download time: (56k = 10 secs)
-
Appendix 11 - Approach Towards Assessing Viability
(PDF)
Size: 16.72 KB
Estimated download time: (56k = 3 secs)



